AWMIS
AWMIS
  • Home
  • Projects
  • Contact Us
  • More
    • Home
    • Projects
    • Contact Us
  • Home
  • Projects
  • Contact Us

Snap Shots

    Remarkable Projects

    Gympie Regional Council

    • Rainbow Beach wastewater model build & master plan
    • Gympie wastewater model build & master plan
    • Detail planning, design & options analysis of SPS S1, SPS G31,G2,G3,G4
    • Cooloola Cove & Tin Can Bay water supply model build 
    • Southside/Gympie water infrastructure plan
    • All Gympie (8 x WTP ) catchment water supply balance model
    • Gympie and Cooloola Cove water supply operational strategies for WTP offline in the weekend
    • Capacity assessment of proposed developments
    • DSS assessment for Rainbow Beach large reservoir offline and serviced by small reservoir only

    City of Gold Coast

    • Detail planning of pump station catchment, pump design for renewal program under Coombabah pressure sewerage system
    • IDM Review or EP Projection of  Main Beach, Staypylton and Pimpama catchments
    • Sewerage load allocation for InfoSWMM of Helensvale, Pimpama, Staypylton & Coombabah catchments 
    • More than 300 development  application assessment for water and waste

    WSP/Logan Water Alliance

    • Loganholm & Beenleigh sewerage master plan verification
    • Loganholm and Beenleigh sewerage model maintenance
    • Coral St model calibration
    • Loganholm & Beenleigh flow monitors and rain gauge field test plan
    • Capacity assessment of proposed developments 

    Tweed Shire Council

    • Central Tweed Heads, East Banora Point and South West Tweed Heads wastewater new model build and calibration 
    • Master plan of Tweed Heads, Banora Point and South West Tweed Heads
    • Whole Tweed Shire water supply model maintenance and update
    • Burringbar-Mooball, Uki & FIngal Heads water reticulation study
    • Cobakai, Altitude Aspire, Salt n Pepper water & sewerage infrastructure strategies
    • Pump, gravity mains and water mains renewal and replacement programs


    Sydney Water

    • Minto, Sutherland & Doonside  SCAMP model build, calibration & system capability assessment
    • Liverpool & Condell Park sewerage system plan

    PWA Qatar

    • Wastewater network asset management plan
    • Industrial area wastewater infrastructure plan

    Calibre Consulting

    • Development Services reports for Oz Pol Retirement Residential Village at Browns Plains, Schematic Multi Residential at Fortitude Valley, ABC Toowong at Toowong and a few more developments 
    • Caboolture West interim water supply and waste water service strategy

    Copyright © 2021 AWMIS - All Rights Reserved.                             ABN 43505781552     

    Powered by GoDaddy